MLB Steel is very pleased to announced that the Company has been awarded Certificate of Conformity for Factory Production Control in accordance with:
EN1090-1:2009+A1:2001 – Execution of Steel Structures and Aluminium Structures. The design, manufacture (including welding) and installation of work in steel up to and including Execution Class 3 (EXC 3) as defined in EN1090-2.
This certification ensure that whether in the form of steel frames or metal roofing, any structural engineers, component manufacturers, and anyone with a hand in the steel or aluminium based components that go into metal buildings/building work are compliant, in accordance with the regulation above.
Managing Director, Chad Ward, said “MLB Steel are committed to maintaining high quality standards throughout our business. Every aspect of fabrication, installation and all related services must meet, or go beyond expected standards, to ensure that we remain at the top of our industry“.